CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION OF CANJULAO RIVER CONTROL, CANJULAO, JAGNA, BOHOL STA.0+000.00-STA.0+142.00-LEFT SIDE, STA.0+172.00-STA.0+500.00-LEFT SIDE,STA.0+000.00-STA.0+477.00-RIGHT SIDE,CANJULAO,JAGNA,BOHOL
CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION OF CANJULAO RIVER CONTROL, CANJULAO, JAGNA, BOHOL STA.0+000.00-STA.0+142.00-LEFT SIDE, STA.0+172.00-STA.0+500.00-LEFT SIDE,STA.0+000.00-STA.0+477.00-RIGHT SIDE,CANJULAO,JAGNA,BOHOL is a DPWH-tracked public work in Bohol 3rd DEO, Region VII. Reported contract value: ₱18,620,168.00. Status: Reported complete (DPWH). Contractor on record: MUANA CONST AND DEVELOPMENT CORP FORMERLY 9354. Figures trace to dpwh.
Total Contract Cost