CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF BINAHAAN SOUTH RIS FLOOD CONTROL WORKS OF TINGIB DAM, PASTRANA,LEYTE
CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF BINAHAAN SOUTH RIS FLOOD CONTROL WORKS OF TINGIB DAM, PASTRANA,LEYTE is a DPWH-tracked public work in Leyte 2nd DEO, Region VIII. Reported contract value: ₱14,689,253.18. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: BEEROCK ENT INC. Figures trace to dpwh.
Total Contract Cost
