CONSTRUCTION OF FLOOD MITIGATION STRUCTURE -CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BAUANG RIVER BASIN SABDANG SECTION, STA. 036+280 - STA. 036+680, SABLAN, BENGUET
CONSTRUCTION OF FLOOD MITIGATION STRUCTURE -CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BAUANG RIVER BASIN SABDANG SECTION, STA. 036+280 - STA. 036+680, SABLAN, BENGUET is a DPWH-tracked public work in Benguet 1st DEO, Cordillera Administrative Region. Reported contract value: ₱13,602,936.34. Status: Reported complete (DPWH). Contractor on record: HGW=3 ENGINEERING. Figures trace to dpwh.
Total Contract Cost
