CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF CORINGOT RIVER CONTROL STRUCTURE (CORINGOT BRIDGE ABUTMENT A AND B UPSTREAM), BARANGAY NASUCOB, BULALACAO, ORIENTAL MINDORO
CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF CORINGOT RIVER CONTROL STRUCTURE (CORINGOT BRIDGE ABUTMENT A AND B UPSTREAM), BARANGAY NASUCOB, BULALACAO, ORIENTAL MINDORO is a DPWH-tracked public work in Southern Mindoro DEO, Region IV-B. Reported contract value: ₱29,095,387.71. Status: Past target date (DPWH On-Going). Contractor on record: D M MALIWANAG BUILDERS AND ENT. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost
