Buildings and Facilities18CI0102

COMPLETE CONSTRUCTION OF 2 STOREY 8 CLASSROOM SCHOOL BUILDING,MARCOS VILLAGE ELEM SCHOOL,MABALACAT CITY,PAMPANGA

COMPLETE CONSTRUCTION OF 2 STOREY 8 CLASSROOM SCHOOL BUILDING,MARCOS VILLAGE ELEM SCHOOL,MABALACAT CITY,PAMPANGA is a DPWH-tracked public work in Pampanga 3rd DEO, Region III. Reported contract value: ₱16,562,532.10. Status: Reported complete (DPWH). Contractor on record: AL-B DEVELOPMENT CORP. Figures trace to dpwh.

Pampanga 3rd DEO, Region III
Region: Region III

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Reinforced Concrete Slope Protection along Sapangbalen Creek, Brgy. San Ildefonso, Sitio Balibago-Sitio Balas, Magalang, Pampanga
GAA fiscal year
FY2018
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROIII-18-0008955

₱0.00 · FY2018

Released to Division of Pampanga (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

64 projects · ₱1.6B total · 0 flags

Other projects by this contractor

FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG ABACAN RIVER, BARANGAY SAPALIBUTAD, ANGELES CITY, PAMPANGA

Pampanga 3rd DEO, Region III

2025₱96.6M
Reported complete (100% progress, DPWH status On-Going)

Construction of Reinforced Concrete Slope Protection Structure along Abacan River, Barangay Pampang, Angeles City, Pampanga

ANGELES CITY (PAMPANGA), PAMPANGA, Region III

2024₱96.5M
Reported complete (DPWH)
No sat.

Construction of Slope Protection Structure along Abacan River, Barangays Malabanas to Anunas, Angeles City, Pampanga

ANGELES CITY (PAMPANGA), PAMPANGA, Region III

2023₱67.5M
Reported complete (DPWH)
No sat.

FLOOF MANAGEMENT PROGRAM; CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS; CONSTRUCTION OF FLOOD CONTROL STRUCTURE IN ANGELES CITY, PAMPANGA (PHASE I)

Pampanga 3rd DEO, Region III

2024₱62.7M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL PROGRAM; CONST/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES;ANGELES CITY TOLL EXIT CONNECTING NLEX AND SCTEX IN SUPPORT OF HANDICRAFT, FURNITURE,MANUFACTURING,HOTEL, IT-IBPM GARMENTS AND TEXTILES IND

Pampanga 3rd DEO, Region III

2020₱57.9M
Reported complete (DPWH)
No sat.

Construction of Reinforced Concrete Slope Protection with Steel Sheet Piles Foundation along Abacan River, Brgy. Tabun to Capaya, Angeles City, Pampanga - Sta. 1+949 - Sta. 2+699

ANGELES CITY (PAMPANGA), PAMPANGA, Region III

2022₱56.0M
Reported complete (DPWH)
View all 64 projects →

4. Implementation

Contract Amount

₱16,562,532.10

Progress

Reported complete (DPWH)

Start Date

July 16, 2018

Target End

December 12, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.