CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF RIVER BANK SLOPE PROTECTION (UPSTREAM OF MAAYON BRIDGE) (RIGHT BANK) STA. 000+000 - STA. 000+322.40, BRGY. POBLACION ILAYA, MAAYON, CAPIZ
CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF RIVER BANK SLOPE PROTECTION (UPSTREAM OF MAAYON BRIDGE) (RIGHT BANK) STA. 000+000 - STA. 000+322.40, BRGY. POBLACION ILAYA, MAAYON, CAPIZ is a DPWH-tracked public work in Capiz 1st DEO, Region VI. Reported contract value: ₱74,552,145.74. Status: Reported complete (DPWH). Contractor on record: MARKBILT CONST TRADING. Figures trace to dpwh.
Total Contract Cost

