Roads18DG0005

ASPHALT OVERLAY - TAGAYTAY - MANILA VIA SILANG ROAD K0056+935-K0057+351, TAGAYTAY CITY

ASPHALT OVERLAY - TAGAYTAY - MANILA VIA SILANG ROAD K0056+935-K0057+351, TAGAYTAY CITY is a DPWH-tracked public work in Cavite 2nd DEO, Region IV-A. Reported contract value: ₱7,931,424.64. Status: Reported complete (DPWH). Contractor on record: N B AVILA CONST. Figures trace to dpwh.

Cavite 2nd DEO, Region IV-A
Region: Region IV-A

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

Possible match · score 81%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Revetment along Cañas River, Brgy. Pinagtipunan Section,Phase 2, Gen. Trias, Cavite
GAA fiscal year
FY2018
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROIVA-18-0004216

₱65,506.00 · FY2018

Released to Cavite District Engineering Office Trust Receipt (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

266 projects · ₱6.8B total · 1 flags

Other projects by this contractor

No sat.

LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS- CONSTRUCTION/REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, WIDENING OF MALAGASANG-BUCANDALA-ALAPAN RD., IMUS, CAVITE

Cavite 1st DEO, Region IV-A

2020₱96.5M
Reported complete (DPWH)
No sat.

PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY ALONG MAR-MAG-AMUYONG RD K0054+(-536)-K0055+730,K005

Cavite 2nd DEO, Region IV-A

2024₱96.5M
Reported complete (DPWH)
No sat.

REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - CAVITE-BATANGAS ROAD (S01988LZ)

Cavite 3rd DEO, Region IV-A

2022₱96.5M
Reported complete (DPWH)

ORGANIZATIONAL OUTCOME 2 - PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION ALONG BALUCTOT RIVER, PHASE II, BRGY.

Cavite 3rd DEO, Region IV-A

2020₱96.5M
Reported complete (DPWH)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD FROM BRGY. SABANG TO BRGY. SAN JOSE, DASMARIÑAS CITY, CAVIT

Cavite 3rd DEO, Region IV-A

2022₱96.5M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONST/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMSCONST OF REVETMENT ALONG MALIMANGO RIVER, BRGY BAGBAG 1, PHASE1, ROSARIO, CAVITE

Cavite 1st DEO, Region IV-A

2024₱95.6M
Past target date (DPWH On-Going)
View all 266 projects →

4. Implementation

Contract Amount

₱7,931,424.64

Progress

Reported complete (DPWH)

Start Date

February 1, 2018

Target End

April 1, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.