Construction of Flood Control Structure, Upstream of Cabug Bridge, Medina, Misamis Oriental
Construction of Flood Control Structure, Upstream of Cabug Bridge, Medina, Misamis Oriental is a DPWH-tracked public work in MEDINA (MISAMIS ORIENTAL), MISAMIS ORIENTAL, Region X. Reported contract value: ₱77,200,000.00. Status: Reported complete (DPWH). Contractor on record: EQUALYZ TRADING. Figures trace to sumbong.
Total Contract Cost
