Flood Control and Drainage23AJ0124

ASSET PRESERVATION - REHABIITATION / RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS (1) ALONG INGALERA RIVER (PHASE II), BRGY. BOLAOIT, MALASIQUI, PANGASINAN, (2) ALONG AGNO RIVER, BRGY. SAN GABRIEL 2ND, BAYAMBANG, PAN

ASSET PRESERVATION - REHABIITATION / RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS (1) ALONG INGALERA RIVER (PHASE II), BRGY. BOLAOIT, MALASIQUI, PANGASINAN, (2) ALONG AGNO RIVER, BRGY. SAN GABRIEL 2ND, BAYAMBANG, PAN is a DPWH-tracked public work in Pangasinan 4th DEO, Region I. Reported contract value: ₱28,486,575.27. Status: Reported complete (DPWH). Contractor on record: JEUSMACK BUILDERS. Figures trace to dpwh.

Pangasinan 4th DEO, Region I
Region: Region I

Money Trail

1. Appropriation

Possible match · score 81%

UACS
18001
Amount
₱14,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure at Barangay Pacuan, Malasiqui, Pangasinan
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Pangasinan 4th DEO · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

4. Implementation

Contract Amount

₱28,486,575.27

Progress

Reported complete (DPWH)

Start Date

November 24, 2023

Target End

February 28, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.