Roads23FI0044

CONCRETING OF BRGY. CONCEPCION TO BRGY. PANGLE FMR, BRGY. CONCEPCION AND BRGY. PANGLE, AROROY, MASBATE

CONCRETING OF BRGY. CONCEPCION TO BRGY. PANGLE FMR, BRGY. CONCEPCION AND BRGY. PANGLE, AROROY, MASBATE is a DPWH-tracked public work in Masbate 2nd DEO, Region V. Reported contract value: ₱11,940,000.00. Status: Reported complete (DPWH). Contractor on record: RED DIAMOND CONST AND SUPPLY CORP FORMERLY: RED DIAMOND CONST. Figures trace to dpwh.

Masbate 2nd DEO, Region V
Region: Region V

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱25,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control System along Bangon River, Sta. 0+000.00 - Sta. 0+067.00 (Downstream, Right Side and Left Side), Sta. 0+244.00 - Sta. 0+337.00 (Upstream, Right and Left Side), Aroroy, Masbate
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Masbate 2nd DEO · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

D

51 projects · ₱1.2B total · 0 flags

Other projects by this contractor

No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BAÑADERO RIVER, MOBO, MAS

Masbate 2nd DEO, Region V

2025₱96.5M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINK/NEW ROADS - MANDAON - DAYHAGAN ROAD, MASBATE, MANDAON, MASBATE

Masbate 2nd DEO, Region V

2023₱49.0M
Reported complete (DPWH)
No sat.

Construction of Flood Protection Measures along Sinalogan River, Brgy. Asid, Masbate City

CITY OF MASBATE (CAPITAL) (MASBATE), MASBATE, Region V

2023₱49.0M
Reported complete (DPWH)
No sat.

ORGANIZTIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/NEW ROADS, MALUBI - CABANGCALAN - DAYHAGAN - TINIGBAN - MATABA ROAD, MASBATE, AROROY, MASBATE

Masbate 2nd DEO, Region V

2023₱49.0M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDING/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY PAJO TO BARANG

Masbate 2nd DEO, Region V

2025₱49.0M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - CONCRETING OF POBLACION, MANDAON - DAYHAGAN, AROROY MASBATE STA. 2+340 - STA. 2+970, NET LENGTH =1.260 LANE KM (0.630 KM), MANDAON, MASBATE

Masbate 2nd DEO, Region V

2020₱43.1M
Reported complete (DPWH)
View all 51 projects →

4. Implementation

Contract Amount

₱11,940,000.00

Progress

Reported complete (DPWH)

Start Date

August 24, 2023

Target End

November 21, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.