Buildings and Facilities17DF0061

LOCALLY-FUNDED PROJECTS, LOCAL INFRASTRUCTURE PROGRAM (LIP), BUILDINGS ANDOTHER STRUCTURES, MULTI-PURPOSE/FACILITIES, CONSTRUCTION OF MULTI-PURPOSE BUILDINGAT NARRA HOMES, PAG-ASA I, IMUS; CONSTRUCTION OF MULTI-PURPOSE BLDG (COVEREDCOURT) AT TREELAN

LOCALLY-FUNDED PROJECTS, LOCAL INFRASTRUCTURE PROGRAM (LIP), BUILDINGS ANDOTHER STRUCTURES, MULTI-PURPOSE/FACILITIES, CONSTRUCTION OF MULTI-PURPOSE BUILDINGAT NARRA HOMES, PAG-ASA I, IMUS; CONSTRUCTION OF MULTI-PURPOSE BLDG (COVEREDCOURT) AT TREELAN is a DPWH-tracked public work in Cavite 1st DEO, Region IV-A. Reported contract value: ₱23,157,637.29. Status: Reported complete (DPWH). Contractor on record: MONTADEL ENT. Figures trace to dpwh.

Cavite 1st DEO, Region IV-A
Region: Region IV-A

Money Trail

1. Appropriation

Possible match · score 80%

UACS
18001
Amount
₱35,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control in Taguilid River, Brgy. Marulas Section, Kawit, Cavite
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROV-17-0009159

₱86,116.00 · FY2017

Released to Division of Camarines Norte (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

38 projects · ₱903.6M total · 2 flags

Other projects by this contractor

Construction of Revetment along Julian River, Barangay Malagasang I-D, West Side, Imus, Cavite

IMUS CITY (CAVITE), CAVITE, Region IV-A

2023₱91.7M
Reported complete (DPWH)
No sat.

Construction of Revetment along Julian River, Brgy. Malagasang II-A, West Side, Imus, Cavite

IMUS CITY (CAVITE), CAVITE, Region IV-A

2022₱90.7M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMSCONST OF REVETMENT ALONG JULIAN RIVER, BRGY. MALAGASANG 1-F, WEST SIDE

Cavite 1st DEO, Region IV-A

2024₱72.4M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOODMANAGEMENT PROGRAM, CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHINMAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF REVETMENT ALONG IMUS RIVER,

Cavite 1st DEO, Region IV-A

2020₱49.0M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERSCONSTRUCTION OF REVETMENT ALONG IMUS RIVER,

Cavite 1st DEO, Region IV-A

2021₱49.0M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAMSUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIESCONSTRUCTION OF BRIDGE/VIADUCT AND ROAD A

Cavite 1st DEO, Region IV-A

2025₱47.5M
Past target date (DPWH On-Going)
View all 38 projects →

4. Implementation

Contract Amount

₱23,157,637.29

Progress

Reported complete (DPWH)

Start Date

March 21, 2017

Target End

September 16, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.