Flood Control and Drainage23FB0073

SIPAG: FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES / FACILITIES - CONSTRUCTION OF RIVER BANK PROTECTION WORKS AND DRAINAGE SYSTEM ALONG COMUN-BINITAYAN-INARADO RIVER (PHASE 2), CAMALIG, ALBAY

SIPAG: FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES / FACILITIES - CONSTRUCTION OF RIVER BANK PROTECTION WORKS AND DRAINAGE SYSTEM ALONG COMUN-BINITAYAN-INARADO RIVER (PHASE 2), CAMALIG, ALBAY is a DPWH-tracked public work in Albay 2nd DEO, Region V. Reported contract value: ₱48,833,800.67. Status: Reported complete (DPWH). Contractor on record: INFRA BUILDERS AND SELLERS PHILIPPINES. Figures trace to dpwh.

Albay 2nd DEO, Region V
Region: Region V

Money Trail

1. Appropriation

Possible match · score 85%

UACS
18001
Amount
₱20,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Protection (Dike) along Brgy. Pawa - Bogtong (Phase 2), Legazpi City, Albay
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Albay 2nd DEO · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

15 projects · ₱938.1M total · 1 flags

Other projects by this contractor

Construction of River Bank Protection Works (Upstream) of Barangay Padang, Legazpi City

LEGAZPI CITY (CAPITAL) (ALBAY), ALBAY, Region V

2022₱96.5M
Reported complete (DPWH)

Construction of River Bank Protection Works and Drainage System along Purok 3 Sitio Laom, Barangay Padang, Legazpi City, Albay

LEGAZPI CITY (CAPITAL) (ALBAY), ALBAY, Region V

2024₱96.5M
Reported complete (DPWH)
No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF RIVER BANK PROTECTION STRUCTURE AND DRAINAGE STRUCTURE, RIVER TRIBUTARIES, BARANGAY TAYSAN, PACKAGE 2, LEGAZPI CITY, ALBAY

Albay 2nd DEO, Region V

2025₱72.4M
Reported complete (100% progress, DPWH status On-Going)
No sat.

BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF RIVER BANK PROTECTION WORKS AND DRAINAGE SYSTEM ALONG BARANGAY PADANG (DOWNSTREAM), PACKAGE 2, LEGAZPI CITY, ALBAY

Albay 2nd DEO, Region V

2024₱69.3M
Past target date (DPWH On-Going)
No sat.

BIP - FLOOD MITIGATION STRUCTURES PROTECTIONG MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF RIVER BANK PROTECTION WORKS AND DRAINAGE SYSTEM ALONG BARANGAY PADANG (DOWNSTREAM), LEGAZPI CITY, ALBAY

Albay 2nd DEO, Region V

2024₱69.3M
Reported complete (DPWH)
No sat.

Construction of River Bank Protection Works and Drainage System along Barangay Padang (Upstream), Legazpi City, Albay

LEGAZPI CITY (CAPITAL) (ALBAY), ALBAY, Region V

2023₱67.5M
Reported complete (DPWH)
View all 15 projects →

4. Implementation

Contract Amount

₱48,833,800.67

Progress

Reported complete (DPWH)

Start Date

April 5, 2023

Target End

September 29, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.