CONSTRUCTION OF RIVER BANK PROTECTION (REVETMENT) ALONG ALIP RIVER (PHASE III), STA. 0+000 - STA. 0+159 (LEFT BANK); STA. 0+000 - STA. 0+168 (RIGHT BANK), DATU PAGLAS, MAGUINDANAO
CONSTRUCTION OF RIVER BANK PROTECTION (REVETMENT) ALONG ALIP RIVER (PHASE III), STA. 0+000 - STA. 0+159 (LEFT BANK); STA. 0+000 - STA. 0+168 (RIGHT BANK), DATU PAGLAS, MAGUINDANAO is a DPWH-tracked public work in Region XII, Region XII. Reported contract value: ₱56,162,933.94. Status: Past target date (DPWH On-Going). Contractor on record: JDRC CONST. Figures trace to dpwh.
Total Contract Cost