Construction of Gucab Flood Control, Barangay Poblacion, La Paz, Abra
Construction of Gucab Flood Control, Barangay Poblacion, La Paz, Abra is a DPWH-tracked public work in LA PAZ (ABRA), ABRA, Cordillera Administrative Region. Reported contract value: ₱46,352,378.91. Status: Reported complete (DPWH). Contractor on record: ST TIMOTHY CONST CORP. Figures trace to sumbong.
Total Contract Cost






