Repair / Rehabilitation of River Control along Sta. Cruz River, Sta. Cruz Section Barangay Patimbao ( Sta. 000+100 - Sta. 000+139 ) (RS) and Barangay Pagsawitan ( Sta. 000+548 - Sta. 000+596) (LS) UPSTREAM, Sta. Cruz, Laguna
Repair / Rehabilitation of River Control along Sta. Cruz River, Sta. Cruz Section Barangay Patimbao ( Sta. 000+100 - Sta. 000+139 ) (RS) and Barangay Pagsawitan ( Sta. 000+548 - Sta. 000+596) (LS) UPSTREAM, Sta. Cruz, Laguna is a DPWH-tracked public work in SANTA CRUZ (CAPITAL) (LAGUNA), LAGUNA, Region IV-A. Reported contract value: ₱18,607,381.02. Status: Reported complete (DPWH). Contractor on record: TRIPLE EAGLE CONST AND TRADING. Figures trace to sumbong.
Total Contract Cost
