CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE RIZAL - DAKAK - DAPITAN COASTAL LOOP ROAD, (S01038MN), ZAMBOANGA DEL NORTE, K1836+820.00 - K1836+860.00, K1856+520.00 - K1856+600.00, K1864+460.00 - K1864+520.00, K1864+695.00 - K1864+723.00, NET LENGTH: 208
CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE RIZAL - DAKAK - DAPITAN COASTAL LOOP ROAD, (S01038MN), ZAMBOANGA DEL NORTE, K1836+820.00 - K1836+860.00, K1856+520.00 - K1856+600.00, K1864+460.00 - K1864+520.00, K1864+695.00 - K1864+723.00, NET LENGTH: 208 is a DPWH-tracked public work in Region IX, Region IX. Reported contract value: ₱140,460,127.47. Status: Reported complete (DPWH). Contractor on record: ST GERRARD CONST GEN CONTRACTOR. Figures trace to dpwh.
Total Contract Cost
