Flood Control and Drainage24FB0272

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF DIKE ALONG BARIW TRIBUTARY CHANNEL, PACKAGE 2, CAMALIG, ALBAY

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF DIKE ALONG BARIW TRIBUTARY CHANNEL, PACKAGE 2, CAMALIG, ALBAY is a DPWH-tracked public work in Albay 2nd DEO, Region V. Reported contract value: ₱93,603,964.33. Status: Past target date (DPWH On-Going). Contractor on record: CBC CONST. Figures trace to dpwh.

Albay 2nd DEO, Region V
Region: Region V

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

Possible match · score 84%

UACS
18001
Amount
₱100,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure ( Dike ) with Drainage System along Taysan, Legazpi City, Albay
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Agency-level releases for FY2024, not tied to this contract

Albay 2nd DEO · SARO 1,917 (₱267,033,855,698.00) · NCA 1,287 (₱846,238,484,493.07)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

Not graded

87 projects · ₱1.3B total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SPECIAL ROAD FUND-MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239-ROAD SAFETY FEATURES/DEVICES ALONG NATIONAL ROADS AND BRIDGES-INSTALLATION OF SOLAR STREET LIGHTS ALONG DAANG MAHARLIKA (LZ)-K0555+699-K0571+556

Region V, Region V

2024₱141.1M
Past target date (DPWH On-Going)
No sat.

CSSP:SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ILAWODLIGBAN ROAD DIKE TRIBUTARY CHANNEL, PACKAGE 2, CAMALIG

Albay 2nd DEO, Region V

2024₱93.6M
Past target date (DPWH On-Going)
No sat.

OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF CAGSAWA FLOOD MITIGATION STRUCTURE ALONG TRIBUTARIES OF BARANGAY BUDIAO TO BARANGAY

Albay 2nd DEO, Region V

2024₱93.6M
Past target date (DPWH On-Going)
No sat.

CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF TAGAYTAY-LIBOD ROAD, CAMALIG, ALBAY

Albay 2nd DEO, Region V

2024₱93.6M
Past target date (DPWH On-Going)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS(SIPAG):ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF SAN JOAQUIN-PAWA-BOGTONG ROAD LEADING TO LEGAZPI CITY AIRPORT,LEGAZPI,

Albay 2nd DEO, Region V

2024₱91.7M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-REHABILITATION OF RIVER BANK PROTECTION WORKS AND DRAINAGE STRUCTURE, DOWNSTREAM SECTION, BAR

Region V, Region V

2025₱50.9M
Past target date (DPWH On-Going)
View all 87 projects →

4. Implementation

Contract Amount

₱93,603,964.33

Progress

Past target date (DPWH On-Going)

Start Date

April 14, 2025

Target End

December 27, 2025

5. Audit