CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF TUBURAN RIVER CONTROL, STA. 0 + 963.60 - STA. 0 + 384.40(R/S), TUBURAN, ODIONGAN, ROMBLON
CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF TUBURAN RIVER CONTROL, STA. 0 + 963.60 - STA. 0 + 384.40(R/S), TUBURAN, ODIONGAN, ROMBLON is a DPWH-tracked public work in Romblon DEO, Region IV-B. Reported contract value: ₱38,307,608.12. Status: Reported complete (DPWH). Contractor on record: E R DELA CRUZ CONST. Figures trace to dpwh.
Total Contract Cost

