CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT PANGANURAN PROPER ALONG GUTALAC - TIPAN BRIDGE SECTION (UPSTREAM), GUTALAC, ZAMBOANGA DEL NORTE
CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT PANGANURAN PROPER ALONG GUTALAC - TIPAN BRIDGE SECTION (UPSTREAM), GUTALAC, ZAMBOANGA DEL NORTE is a DPWH-tracked public work in Zamboanga del Norte 3rd DEO, Region IX. Reported contract value: ₱24,130,563.86. Status: Past target date (DPWH On-Going). Contractor on record: ST JOSEPH CONST. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost
