Construction of Flood Mitigation Structure along Solana River (Upstream and Downstream of Solana By-Pass Bridge), Package 1, Jasaan, Misamis Oriental
Construction of Flood Mitigation Structure along Solana River (Upstream and Downstream of Solana By-Pass Bridge), Package 1, Jasaan, Misamis Oriental is a DPWH-tracked public work in JASAAN (MISAMIS ORIENTAL), MISAMIS ORIENTAL, Region X. Reported contract value: ₱96,500,000.00. Status: Reported complete (DPWH). Contractor on record: MIKKIL CONST / VICTORIANO C LIM CONST CORP FORMERLY: VICTORIANO C LIM CONST. Figures trace to sumbong.