REHABILITATION/RECONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BICOL RIVER, BRGY. SAN MIGUEL (POB.) AND BRGY. ALIMBUYOG, MILAOR, CAMARINES SUR, MILAOR, CAMARINES SUR (2ND LEGISLATIVE DISTRICT)
REHABILITATION/RECONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BICOL RIVER, BRGY. SAN MIGUEL (POB.) AND BRGY. ALIMBUYOG, MILAOR, CAMARINES SUR, MILAOR, CAMARINES SUR (2ND LEGISLATIVE DISTRICT) is a DPWH-tracked public work in Region V, Region V. Reported contract value: ₱104,806,102.37. Status: Past target date (DPWH On-Going). Contractor on record: G C I CONST AND DEV'T CORP 11346. Figures trace to dpwh.
Total Contract Cost

