Buildings and Facilities23CC0595

CONSTRUCTION OF MULTI-PURPOSE BUILDING TAAL NATUIONAL HIGH SCHOOL, BOCAUE, BULACAN

CONSTRUCTION OF MULTI-PURPOSE BUILDING TAAL NATUIONAL HIGH SCHOOL, BOCAUE, BULACAN is a DPWH-tracked public work in Bulacan 1st DEO, Region III. Reported contract value: ₱47,186,607.27. Status: Past target date (DPWH On-Going). Contractor on record: AMETHYST HORIZON BUILDERS AND GEN CONTRACTOR AND DEVELOPMENT CORP REVOKED 49129. Figures trace to dpwh.

Bulacan 1st DEO, Region III
Region: Region III

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱5,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure (riprapping) Barangay Igulot, Bocaue, Bulacan
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Bulacan 1st DEO · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

DPWH ID 49129

126 projects · ₱7.6B total · 0 flags

Other projects by this contractor

No sat.

CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF BANK PROTECTION STRUCTURE WITH ROAD DIKE ALONG LUMINTAO RIVER, BRGY. MAGSIKAP AND BRGY. MALAWAAN (DOWNSTREAM), RIZAL, OCC. MINDORO

Region IV-B, Region IV-B

2025₱225.6M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE & SPL. SUPPORT PROG.-SUSTAINABLE INFRA PROJS. ALLEVIATING GAPS (SIPAG)-ACCESS RDS. AND/OR BRS. FR. THE NAT'L. ROAD/S LEAD. TO MAJOR/STRATEGIC PUBLIC BLDG.S/FACILITIES-CONST. OF RD., BRGY. LIYANG, PILAR TO BRGY. BILOLO, ORION, BATAAN PACKAGE 2

Region III, Region III

2023₱193.0M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY BATANG - BARANGAY GARAWON, HERNANI, EASTERN SAMAR

Region VIII, Region VIII

2024₱192.4M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TAFT RIVER, BARANGAY SAN PABLO, TAFT, EASTERN SAMAR

Region VIII, Region VIII

2024₱191.9M
Past target date (DPWH On-Going)
No sat.

FY 2024 DPWH INFRASTRUCTURE PROGRAMORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMNETWORK DEVELOPMENT PROGRAMCONSTRUCTION OF BY-PASS AND DIVERSION ROADSPADRE BURGOS BY-PASS ROAD, QUEZON (PACKAGE 4)

Region IV-A, Region IV-A

2024₱189.1M
Past target date (DPWH On-Going)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF EAST COASTAL ROAD, BRGY. PAGKAKAISA SECTION, PTO. PRINCESA CITY, PALAWAN

Region IV-B, Region IV-B

2024₱186.2M
Past target date (DPWH On-Going)
View all 126 projects →

4. Implementation

Contract Amount

₱47,186,607.27

Progress

Past target date (DPWH On-Going)

Start Date

April 23, 2024

Target End

December 18, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.