Roads25CI0094

CONCRETING OF BRGY. SAN MIGUEL TO BRGY. BUCANAN TO BRGY. SAN ILDEFONSO FMR, MAGALANG, PAMPANGA

CONCRETING OF BRGY. SAN MIGUEL TO BRGY. BUCANAN TO BRGY. SAN ILDEFONSO FMR, MAGALANG, PAMPANGA is a DPWH-tracked public work in Pampanga 3rd DEO, Region III. Reported contract value: ₱14,917,361.66. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: ARROWHEAD CONST 22597. Figures trace to dpwh.

Pampanga 3rd DEO, Region III
Region: Region III

Money Trail

1. Appropriation

Possible match · score 84%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Alasas Creek (Phase III), Barangay San Agustin, Magalang, Pampanga
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Agency-level releases for FY2025, not tied to this contract

Pampanga 3rd DEO · SARO 1,540 (₱654,314,185,039.00) · NCA 1,270 (₱735,120,377,953.60)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

Not graded

DPWH ID 22597

17 projects · ₱295.3M total · 0 flags

Other projects by this contractor

No sat.

FLOOD MANAGEMENT PROGRAM;CONST/MAINTENANCE OF FLOOD MITIGATION STRUCTUREAS AND DRAINAGE SYSTEMS; CONSTRUCTION OF SAPANGBALEN RIVER WALL (SLOPE PROTECTION WITH GROUNDSILL), MABALACAT CITY, PAMPANGA

Pampanga 3rd DEO, Region III

2020₱49.0M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM;LOCAL INFRASTRUCTURE PROGRAM;FLOOD CONTROL AND DRAINAGE-DRAINAGE/PROTECTION WORKS;CONSTRUCTION OF SLOPE PROTECTION ALONG SAPANGBATO RIVER, BRGY MARGOT,ANGELES CITY,PAMPANGA

Pampanga 3rd DEO, Region III

2021₱34.3M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF OSPITAL NING CAPAS (ONC), MAIN BUILDING, MUNICIPAL COMPOUND, CAPAS, TARLAC

Tarlac 2nd DEO, Region III

2024₱29.7M
Past target date (DPWH On-Going)
No sat.

SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG); FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRA/FACILITIES; CONST OF SLOPE PROTECTION STRUCTURE ALONG SAPANGBATO RIVER, BRGY MARGOT, ANGELES CITY, PAMPANGA

Pampanga 3rd DEO, Region III

2022₱24.5M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM; SPECIAL ROAD FUND-MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239: CONSTRUCTION OF PEDESTRIAN OVERPASS- MANILA NORTH ROAD-K087+490

Pampanga 3rd DEO, Region III

2024₱23.5M
Reported complete (100% progress, DPWH status On-Going)
No sat.

FLOOD MANAGEMENT PROGRAM; CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, SLOPE PROTECTION WORKS ALONG QUITANGIL CREEK, BARANGAY BUNDAGUL AND PARALAYUNAN, MABALACAT CITY, PAMPANGA

Pampanga 3rd DEO, Region III

2018₱23.2M
Reported complete (DPWH)
View all 17 projects →

4. Implementation

Contract Amount

₱14,917,361.66

Progress

Reported complete (100% progress, DPWH status On-Going)

Start Date

May 29, 2025

Target End

August 15, 2025