OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLDS: FLD. MNG'T PROGRAM: CONST'N/MAINTENANCE OF FLD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONST'N OF ARCON RIVER REVETMENT WITH STEEL SHEET PILES, STA. 000+000-STA. 000+349 (UPSTREAM)
OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLDS: FLD. MNG'T PROGRAM: CONST'N/MAINTENANCE OF FLD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONST'N OF ARCON RIVER REVETMENT WITH STEEL SHEET PILES, STA. 000+000-STA. 000+349 (UPSTREAM) is a DPWH-tracked public work in Region II, Region II. Reported contract value: ₱87,748,696.36. Status: Reported complete (DPWH). Contractor on record: EGB CONST CORP FORMERLY: EGB CONST. Figures trace to dpwh.
Total Contract Cost

