Flood Control and Drainage25AA0543

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRA/FACILITIES - CONSTRUCTION OF SMALL WATER IMPOUNDING PROJECT (SWIP), BARANGAY 57 PILA, L.C., I.N.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRA/FACILITIES - CONSTRUCTION OF SMALL WATER IMPOUNDING PROJECT (SWIP), BARANGAY 57 PILA, L.C., I.N. is a DPWH-tracked public work in Ilocos Norte 1st DEO, Region I. Reported contract value: ₱4,744,288.71. Status: Past target date (DPWH On-Going). Contractor on record: KHAY ALI CONST. Figures trace to dpwh.

Ilocos Norte 1st DEO, Region I
Region: Region I

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

Possible match · score 84%

UACS
18001
Amount
₱30,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Bislak River, (SWIP) Small Water Impounding Project, Barangay Canaam, Vintar, Ilocos Norte
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Agency-level releases for FY2025, not tied to this contract

Ilocos Norte 1st DEO · SARO 1,540 (₱654,314,185,039.00) · NCA 1,270 (₱735,120,377,953.60)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

20 projects · ₱92.4M total · 0 flags

Other projects by this contractor

No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY 1 SAN LORENZO, LAOAG CITY, ILOCOS NORTE

Ilocos Norte 1st DEO, Region I

2025₱4.9M
Past target date (DPWH On-Going)
No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY 60-B MADILADIG, LAOAG CITY, ILOCOS NORTE

Ilocos Norte 1st DEO, Region I

2025₱4.9M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY 4 SAN GUILLERMO, LAOAG CITY, ILOCOS NORTE

Ilocos Norte 1st DEO, Region I

2025₱4.8M
Past target date (DPWH On-Going)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD,BARANGAY NAGSANGA, PASUQUIN, ILOCOS NORTE

Ilocos Norte 1st DEO, Region I

2025₱4.8M
Ongoing (DPWH-reported)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF IRRIGATION CANAL, BARANGAY 14 BINSANG, PASUQUIN, I.N.

Ilocos Norte 1st DEO, Region I

2025₱4.8M
Ongoing (DPWH-reported)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF IRRIGATION CANAL, BARANGAY 60-B MADILADIG, LAOAG CITY, ILOCOS NORTE

Ilocos Norte 1st DEO, Region I

2025₱4.8M
Past target date (DPWH On-Going)
View all 20 projects →

4. Implementation

Contract Amount

₱4,744,288.71

Progress

Past target date (DPWH On-Going)

Start Date

April 8, 2025

Target End

May 10, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.