Water Provision and Storage24BH0288

BASIC INFRASTRUCTURE PROGRAM (BIP) - PUBLIC WATER SUPPLY SYSTEM - CONSTRUCTION OF PUBLIC WATER SUPPLY SYSTEM (LEVEL 2) AT BARANGAYS MANAOAG, DIANAO AND DE VERA, CAUAYAN CIITY, ISABELA

BASIC INFRASTRUCTURE PROGRAM (BIP) - PUBLIC WATER SUPPLY SYSTEM - CONSTRUCTION OF PUBLIC WATER SUPPLY SYSTEM (LEVEL 2) AT BARANGAYS MANAOAG, DIANAO AND DE VERA, CAUAYAN CIITY, ISABELA is a DPWH-tracked public work in Isabela 4th DEO, Region II. Reported contract value: ₱4,909,930.00. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: J3P CONST AND DEVELOPER CORP. Figures trace to dpwh.

Isabela 4th DEO, Region II
Region: Region II

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

Possible match · score 81%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Dammang West Flood Control Structure, Echague, Isabela
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Agency-level releases for FY2024, not tied to this contract

Isabela 4th DEO · SARO 1,917 (₱267,033,855,698.00) · NCA 1,287 (₱846,238,484,493.07)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

33 projects · ₱304.8M total · 0 flags

Other projects by this contractor

No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) -ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONCRETING OF ARABIAT ROAD, BRGY. ARABIAT,ECHAGUE, ISABELA

Isabela 4th DEO, Region II

2023₱29.4M
Reported complete (100% progress, DPWH status On-Going)
No sat.

OO1: ENSURE SAFE & RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS - PEÑABLANCA - CALLAO CAVE RD. -PHASE III PACKAGE 1,K0483+(-090)-K0483+(-068)

Cagayan 3rd DEO, Region II

2023₱24.0M
Reported complete (DPWH)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS(SIPAG):ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF MACANAO BRIDGE (PHASE II), LUNA,ISABELA

Isabela 2nd DEO, Region II

2022₱19.5M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF MACAÑAO BRIDGE, BRGY. MACAÑAO, LUNA, ISABELA

Isabela 2nd DEO, Region II

2021₱19.3M
Reported complete (DPWH)
No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE FACILITY, SAN AGUSTIN, ISABELA

Isabela 4th DEO, Region II

2022₱14.8M
Reported complete (DPWH)
No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF NARRA TO MABBAYAD ROAD, ECHAGUE, ISABELA

Isabela 4th DEO, Region II

2023₱14.8M
Past target date (DPWH On-Going)
View all 33 projects →

4. Implementation

Contract Amount

₱4,909,930.00

Progress

Reported complete (100% progress, DPWH status On-Going)

Start Date

July 25, 2024

Target End

January 20, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.