Construction of Flood Control Structure along Upper Marikina River (Phase III, R/S), Brgy. San Jose, Rodriguez, Rizal
Construction of Flood Control Structure along Upper Marikina River (Phase III, R/S), Brgy. San Jose, Rodriguez, Rizal is a DPWH-tracked public work in MONTALBAN (RIZAL), RIZAL, Region IV-A. Reported contract value: ₱94,464,205.36. Status: Reported complete (DPWH). Contractor on record: KAEL CONST AND SUPPLY. Figures trace to sumbong.
Total Contract Cost
