Roads17PD0042

ASSET PRESERVATION OF NATIONAL ROADS-REHAB/RECONST. OF NATIONAL ROADS WITH SLIP, SLOPE COLLAPSE, AND LANDSLIDE-SECONDARY: REH/MAJOR REPAIR OF ROAD SLOPE PROTECTION STRUCTURE-WESTERNLINK CIRCUMFERENTIAL ROAD., KO247+485-KO247+616

ASSET PRESERVATION OF NATIONAL ROADS-REHAB/RECONST. OF NATIONAL ROADS WITH SLIP, SLOPE COLLAPSE, AND LANDSLIDE-SECONDARY: REH/MAJOR REPAIR OF ROAD SLOPE PROTECTION STRUCTURE-WESTERNLINK CIRCUMFERENTIAL ROAD., KO247+485-KO247+616 is a DPWH-tracked public work in Baguio City DEO, Cordillera Administrative Region. Reported contract value: ₱14,804,238.57. Status: Reported complete (DPWH). Contractor on record: MEP CONST. Figures trace to dpwh.

Baguio City DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱2,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Drainage and Flood Control System (Domawa's Residence To Lower Dagsian And Camp 7 Boundary), Lower Dagsian, Baguio City, Benguet
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROX-17-0025803

₱6,505,000.00 · FY2017

Released to Northern Mindanao Medical Center (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

20 projects · ₱1.0B total · 0 flags

Other projects by this contractor

View all 20 projects →

4. Implementation

Contract Amount

₱14,804,238.57

Progress

Reported complete (DPWH)

Start Date

July 3, 2017

Target End

January 13, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.