Construction of Flood Control Structure along Maramag Maradugao Road (Downstream), Macapantig Bridge with Slope Protection, Kalilangan, Bukidnon
Construction of Flood Control Structure along Maramag Maradugao Road (Downstream), Macapantig Bridge with Slope Protection, Kalilangan, Bukidnon is a DPWH-tracked public work in KALILANGAN (BUKIDNON), BUKIDNON, Region X. Reported contract value: ₱49,000,000.00. Status: Reported complete (DPWH). Contractor on record: M MONTESCLAROS ENT INC. Figures trace to sumbong.
Total Contract Cost
