Flood Control and Drainage15DP0107

CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM AT MALAUNOD RIVER PASSING THRU POBLACION MAHARLIKA HIGHWAY, SAN PABLO SECTION, LAGUNA

CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM AT MALAUNOD RIVER PASSING THRU POBLACION MAHARLIKA HIGHWAY, SAN PABLO SECTION, LAGUNA is a DPWH-tracked public work in Laguna 3rd DEO, Region IV-A. Reported contract value: ₱18,532,195.68. Status: Reported complete (DPWH). Contractor on record: T SOLOMON CONST AND DEVELOPMENT CORPORATIO. Figures trace to dpwh.

Laguna 3rd DEO, Region IV-A
Region: Region IV-A

Money Trail

1. Appropriation

Probable match · score 92%

UACS
18001
Amount
₱19,500,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction / Maintenance of Flood Mitigation Structures and Drainage Systems at Malaunod River Passing thru Poblacion Maharlika Highway, San Pablo City Section, Laguna
GAA fiscal year
FY2016
DBM GAA source document

2. Allotment

Agency-level releases for FY2016, not tied to this contract

Laguna 3rd DEO · SARO 2,111 (₱111,347,307,043.00) · NCA 0 (₱0.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

60 projects · ₱1.6B total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, IMPROVEMENT OF ROAD ALONG QUATRO SANTOS R

Batangas 4th DEO, Region IV-A

2024₱93.6M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, MANILA - BATANGAS BYPASS ROAD PACKAGE E, BATANGAS

Batangas 4th DEO, Region IV-A

2021₱93.6M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING AT PANGAO INTEGRATED SCHOOL, BARANGAY PANGAO, LIPA CITY, BATANGAS

Batangas 4th DEO, Region IV-A

2024₱78.7M
Past target date (DPWH On-Going)
No sat.

ROAD WIDENING - SECONDARY ROADS DIOKNO HIGHWAY - K0073+000.00 - K0073+440.00, K0075+577.00 - K0076+303.00

Region IV-A, Region IV-A

2022₱57.5M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG BALETE SECT

Batangas 3rd DEO, Region IV-A

2025₱56.4M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING AT SITIO STO. TORIBIO ELEMENTARY SCHOOL, BARANGAY

Batangas 4th DEO, Region IV-A

2023₱51.5M
Reported complete (DPWH)
View all 60 projects →

4. Implementation

Contract Amount

₱18,532,195.68

Progress

Reported complete (DPWH)

Start Date

January 20, 2016

Target End

July 17, 2016

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.