Flood Control and Drainage20DC0055

LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, FLOOD CONTROL AND DRAINAGE, DRAINAGE/PROTECTION WORKS, CONSTRUCTION OF DRAINAGE SYSTEM, BRGY. SAN PIOQUINTO, MALVAR, BATANGAS

LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, FLOOD CONTROL AND DRAINAGE, DRAINAGE/PROTECTION WORKS, CONSTRUCTION OF DRAINAGE SYSTEM, BRGY. SAN PIOQUINTO, MALVAR, BATANGAS is a DPWH-tracked public work in Batangas 3rd DEO, Region IV-A. Reported contract value: ₱959,802.00. Status: Reported complete (DPWH). Contractor on record: NDA BUILDERS AND DEVELOPERS 36218. Figures trace to dpwh.

Batangas 3rd DEO, Region IV-A
Region: Region IV-A

Money Trail

1. Appropriation

No GAA appropriation line matched for this project at current confidence thresholds.

2. Allotment

No SARO/NCA release rows linked to this project yet. See DBM release listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

DPWH ID 36218

96 projects · ₱1.1B total · 0 flags

Other projects by this contractor

No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES, AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE A

Batangas 3rd DEO, Region IV-A

2025₱111.2M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 2:PROTECT LIVES AND PROPERTIES, AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AL

Batangas 3rd DEO, Region IV-A

2025₱108.1M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION - PREVENTIVE MAINTENANCE - PRIMARY ROADS, DAANG MAHARLIKA (LZ) - K0060+078 - K0060+800

Batangas 3rd DEO, Region IV-A

2022₱66.9M
Reported complete (DPWH)
No sat.

PREVENTIVE MAINTENANCE - PRIMARY ROADS MAHARLIKA HIGHWAY - K0058 + 076 - K0058 + 603

Region IV-A, Region IV-A

2025₱59.2M
Reported complete (100% progress, DPWH status On-Going)
No sat.

REHABILITATION OF SAMBAT FLYOVER ALONG TANAUAN-TALISAY-TAGAYTAY ROAD

Batangas 3rd DEO, Region IV-A

2024₱48.2M
Reported complete (100% progress, DPWH status On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVATING GAPS (SIPAG), SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD ALONG T

Batangas 3rd DEO, Region IV-A

2024₱47.8M
Reported complete (100% progress, DPWH status On-Going)
View all 96 projects →

4. Implementation

Contract Amount

₱959,802.00

Progress

Reported complete (DPWH)

Start Date

September 7, 2020

Target End

November 5, 2020

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.