Flood Control and Drainage25AA0475

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONST OF FLOOD CONTROL STRUCTURE ALONG DAURAO CREEK, DOWNSTREAM OF CASILI BRIDGE, BARANGAY CASILI, LAOAG CITY, I.N.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONST OF FLOOD CONTROL STRUCTURE ALONG DAURAO CREEK, DOWNSTREAM OF CASILI BRIDGE, BARANGAY CASILI, LAOAG CITY, I.N. is a DPWH-tracked public work in Ilocos Norte 1st DEO, Region I. Reported contract value: ₱47,022,160.24. Status: Past target date (DPWH On-Going). Contractor on record: 11-16 CONST. Figures trace to dpwh.

Ilocos Norte 1st DEO, Region I
Region: Region I

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

Probable match · score 88%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Daurao Creek, Downstream of Casili Bridge, Barangay Casili, Laoag City, Ilocos Norte
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Agency-level releases for FY2025, not tied to this contract

Ilocos Norte 1st DEO · SARO 1,540 (₱654,314,185,039.00) · NCA 1,270 (₱735,120,377,953.60)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

244 projects · ₱19.8B total · 0 flags

4. Implementation

Contract Amount

₱47,022,160.24

Progress

Past target date (DPWH On-Going)

Start Date

February 13, 2025

Target End

September 1, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.