COSNTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD CONTROL SYSTEM ALONG TINAPIAN RIVER, BALENO, MASBATE, STA. 0+590.00 - STA. 0+965 (RIGHTSIDE, DOWNSTREAM TO UPSTREAM), STA. 0+590.00 - STA. 0+965 (LEFTSIDE, DOWNSTREAM TO UPSTREAM), BALENO,
COSNTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD CONTROL SYSTEM ALONG TINAPIAN RIVER, BALENO, MASBATE, STA. 0+590.00 - STA. 0+965 (RIGHTSIDE, DOWNSTREAM TO UPSTREAM), STA. 0+590.00 - STA. 0+965 (LEFTSIDE, DOWNSTREAM TO UPSTREAM), BALENO, is a DPWH-tracked public work in Masbate 2nd DEO, Region V. Reported contract value: ₱47,262,456.12. Status: Reported complete (DPWH). Contractor on record: STEVEN CONST. Figures trace to dpwh.
Total Contract Cost
