CONSTRUCTION OF FLOOD CONTROL STRUCTURE PROTECTING PAGTILAAN STEEL BRIDGE, LINGIG, SURIGAO DEL SUR
CONSTRUCTION OF FLOOD CONTROL STRUCTURE PROTECTING PAGTILAAN STEEL BRIDGE, LINGIG, SURIGAO DEL SUR is a DPWH-tracked public work in Surigao del Sur 2nd DEO, Region XIII. Reported contract value: ₱95,482,996.89. Status: Past target date (DPWH On-Going). Contractor on record: CONCEPCION BASIC BUILDERS INC. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost