Construction of Flood Control Structure along Brgy. Sabang Zone 2 and Brgy. Looc, Allen, Northern Samar
Construction of Flood Control Structure along Brgy. Sabang Zone 2 and Brgy. Looc, Allen, Northern Samar is a DPWH-tracked public work in ALLEN (NORTHERN SAMAR), NORTHERN SAMAR, Region VIII. Reported contract value: ₱48,960,370.30. Status: Reported complete (DPWH). Contractor on record: C A CONST AND SUPPLY / CDU CONST. Figures trace to sumbong.
Total Contract Cost
