Rehabilitation of Dike along O'Donnell River, Sta. 8 + 564 to 8 + 888, Downstream of Bueno Bride 1, Left Bank, Capas Tarlac
Rehabilitation of Dike along O'Donnell River, Sta. 8 + 564 to 8 + 888, Downstream of Bueno Bride 1, Left Bank, Capas Tarlac is a DPWH-tracked public work in CAPAS (TARLAC), TARLAC, Region III. Reported contract value: ₱72,336,770.79. Status: Reported complete (DPWH). Contractor on record: 11-16 CONST / BOLTRON BUILDERS CORP. Figures trace to sumbong.
Total Contract Cost
