Flood Control and Drainage19PL0078

CONSTRUCTION OF NAMECBECAN CREEK FLOOD CONTROL, UBBOG, BRGY. MAGSAYSAY, TABUK CITY, KALINGA

CONSTRUCTION OF NAMECBECAN CREEK FLOOD CONTROL, UBBOG, BRGY. MAGSAYSAY, TABUK CITY, KALINGA is a DPWH-tracked public work in Lower Kalinga DEO, Cordillera Administrative Region. Reported contract value: ₱848,243.84. Status: Reported complete (DPWH). Contractor on record: MATAGOAN KJ BUILDERS AND ENGINEERING SERVICES 44287. Figures trace to dpwh.

Lower Kalinga DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

GAA FY2019 not yet loaded (source: DBM GAA)

2. Allotment

No SARO/NCA release rows linked to this project yet. See DBM release listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

DPWH ID 44287

33 projects · ₱134.4M total · 0 flags

Other projects by this contractor

No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP) - INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS) - CONSTRUCTION OF MANGBA ROAD LEADING TO LGU PABAHAY ROAD, BARANGAY BALONG, TABUK CITY, KALINGA

Lower Kalinga DEO, Cordillera Administrative Region

2023₱29.6M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF JANOM SISIM FLOOD CONTROL STA. 179+550 - STA. 179+310 (R.

Upper Kalinga DEO, Cordillera Administrative Region

2021₱9.8M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF CHINA-AW FLOOD CONTROL STA. 170+790 - 170+970 (R.S.), BAL

Upper Kalinga DEO, Cordillera Administrative Region

2021₱9.7M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF LINAS-SAYANGAN CREEK FLOOD CONTROL STA. 173+790 - STA. 17

Upper Kalinga DEO, Cordillera Administrative Region

2021₱9.0M
Reported complete (DPWH)
No sat.

ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE SECONDARY ROADS - MT. PROVINCE BOUNDARY-CALANAN-PINUKPUK-ABBUT ROAD (PINUKPUK-ABBUT SECTION), K0523+856-K0523+936, K0528+982-K0528+997, K0529+048-

Lower Kalinga DEO, Cordillera Administrative Region

2020₱6.4M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS-MT. PROVINCE BDRY.-CALANAN-PINUKPUK-ABBUT ROAD (PINUKP

Lower Kalinga DEO, Cordillera Administrative Region

2022₱5.8M
Reported complete (DPWH)
View all 33 projects →

4. Implementation

Contract Amount

₱848,243.84

Progress

Reported complete (DPWH)

Start Date

July 18, 2019

Target End

August 16, 2019

5. Audit