CONSTRUCTION MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONSTRUCTION OF BRGY. 7 - CALZADA FLOOD CONTROL SYSTEM (LEFT SIDE), CAMALIG, ALBAY
CONSTRUCTION MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONSTRUCTION OF BRGY. 7 - CALZADA FLOOD CONTROL SYSTEM (LEFT SIDE), CAMALIG, ALBAY is a DPWH-tracked public work in Albay 2nd DEO, Region V. Reported contract value: ₱13,706,706.50. Status: Reported complete (DPWH). Contractor on record: ROLCO CONST. Figures trace to dpwh.
Total Contract Cost
