CONSTRUCTION OF FLOOD CONTROL ALONG LAMUT RIVER, STA. 18+300 - STA. 18+900 (LAWIG SIDE), LAMUT, IFUGAO
CONSTRUCTION OF FLOOD CONTROL ALONG LAMUT RIVER, STA. 18+300 - STA. 18+900 (LAWIG SIDE), LAMUT, IFUGAO is a DPWH-tracked public work in Cordillera Administrative Region, Cordillera Administrative Region. Reported contract value: ₱38,117,500.00. Status: Past target date (DPWH On-Going). Contractor on record: DJY CONST. Figures trace to dpwh.
Total Contract Cost
