CONSTRUCTION OF SLOPE PROTECTION WORKS ALONG ILOILO RIVER, LEFT BANK (FROM QUIRINO- LOPEZ BRIDGE TO MUELLEY LONEY BRIDGE (DRILON BRIDGE)), (ESPLANADE 11), ILOILO CITY
CONSTRUCTION OF SLOPE PROTECTION WORKS ALONG ILOILO RIVER, LEFT BANK (FROM QUIRINO- LOPEZ BRIDGE TO MUELLEY LONEY BRIDGE (DRILON BRIDGE)), (ESPLANADE 11), ILOILO CITY is a DPWH-tracked public work in Region VI, Region VI. Reported contract value: ₱91,555,340.00. Status: Past target date (DPWH On-Going). Contractor on record: F GURREA CONST INC. Figures trace to dpwh.
Total Contract Cost
