CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF PAGINA I RIVER CONTROL, STA. 0+120.00 - STA. 0+420.00 (RIGHT SIDE), STA. 0+120.00 - STA. 0+381.50 (LEFT SIDE), JAGNA, BOHOL
CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF PAGINA I RIVER CONTROL, STA. 0+120.00 - STA. 0+420.00 (RIGHT SIDE), STA. 0+120.00 - STA. 0+381.50 (LEFT SIDE), JAGNA, BOHOL is a DPWH-tracked public work in Bohol 3rd DEO, Region VII. Reported contract value: ₱9,308,168.00. Status: Reported complete (DPWH). Contractor on record: MUANA CONST AND DEVELOPMENT CORP FORMERLY 9354. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost

