Flood Control and Drainage25OH0133

CONSTRUCTION OF ROAD AND DRAINAGE SYSTEM ALONG ROXAS BOULEVARD SERVICE ROAD, MANILA CITY

CONSTRUCTION OF ROAD AND DRAINAGE SYSTEM ALONG ROXAS BOULEVARD SERVICE ROAD, MANILA CITY is a DPWH-tracked public work in South Manila DEO, National Capital Region. Reported contract value: ₱47,282,313.91. Status: Past target date (DPWH On-Going). Contractor on record: DMLC BUILDERS 36650. Figures trace to dpwh.

South Manila DEO, National Capital Region
Region: National Capital Region

Money Trail

1. Appropriation

Possible match · score 79%

UACS
18001
Amount
₱15,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structure along Estero de Sunog Apog, Barangay 172, Manila City
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Agency-level releases for FY2025, not tied to this contract

South Manila DEO · SARO 1,540 (₱654,314,185,039.00) · NCA 1,270 (₱735,120,377,953.60)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

Not graded

DPWH ID 36650

87 projects · ₱3.8B total · 0 flags

Other projects by this contractor

No sat.

CONSTRUCTION OF BARANGAY CALAMPINAY COASTAL ROAD (COBCOBAN SECTION), SIPOCOT, CAMARINES SUR

Camarines Sur 1st DEO, Region V

2025₱141.2M
Past target date (DPWH On-Going)

CLUSTER 9: REPAIR/REHABILITATION OF FLOOD CONTROL/DRAINAGE STRUCTURES,RAGAY, CAMARINES SUR

Camarines Sur 1st DEO, Region V

2024₱112.9M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT SITIO NONOK, BARANGAY MONTAÑEZA - SITIO WALO

Cebu 7th DEO, Region VII

2025₱99.8M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROBASIC INFRASTRUCTURE PROGRAM (BIP)BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIESCONSTRUCTION OF REVETMENT ALONG YLANG-YLANG, SAN FRANCISCO, GEN. TRIAS, CAVITE (PHASE III)

Cavite 1st DEO, Region IV-A

2024₱99.0M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIESCONST OF REVETMENT ALONG RIO GRANDE RIVER RIVER, BARANGAY SANTIAGO, GEN. TRIAS, CAVITE

Cavite 1st DEO, Region IV-A

2024₱99.0M
Past target date (DPWH On-Going)

CONSTRUCTION OF SLOPE PROTECTION AT LAWIS RIVER, UPSTREAM, CANDELARIA, ZAMBALES (PHASE 5)

Zambales 1st DEO, Region III

2023₱98.0M
Reported complete (100% progress, DPWH status On-Going)
View all 87 projects →

4. Implementation

Contract Amount

₱47,282,313.91

Progress

Past target date (DPWH On-Going)

Start Date

April 10, 2025

Target End

October 6, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.