Construction of Flood Control Structure, Laoag River Basin and Sabo Flood Control Structure along Gadgadawan River (Right Bank), Barangay Barikir, Nueva Era, Ilocos Norte
Construction of Flood Control Structure, Laoag River Basin and Sabo Flood Control Structure along Gadgadawan River (Right Bank), Barangay Barikir, Nueva Era, Ilocos Norte is a DPWH-tracked public work in NUEVA ERA (ILOCOS NORTE), ILOCOS NORTE, Region I. Reported contract value: ₱48,249,996.90. Status: Reported complete (DPWH). Contractor on record: ST MATTHEW GEN CONTRACTOR & DEVELOPMENT CORP. Figures trace to sumbong.
Total Contract Cost