Flood Control and Drainage20CI0035

FLOOD MANAGEMENT PROGRAM;CONST/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS;CONST OF REINFORCED CONCRETE SLOPE PROTECTION WITH STEEL SHEET PILES FOUNDATION ALONG ABACAN RIVER, STA. 6+980 TO STA 7+484 (R/S) AT BRGY PAMPANG, A.C.

FLOOD MANAGEMENT PROGRAM;CONST/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS;CONST OF REINFORCED CONCRETE SLOPE PROTECTION WITH STEEL SHEET PILES FOUNDATION ALONG ABACAN RIVER, STA. 6+980 TO STA 7+484 (R/S) AT BRGY PAMPANG, A.C. is a DPWH-tracked public work in Pampanga 3rd DEO, Region III. Reported contract value: ₱43,941,858.68. Status: Reported complete (DPWH). Contractor on record: AL-B DEVELOPMENT CORP. Figures trace to dpwh.

Pampanga 3rd DEO, Region III
Region: Region III

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱40,768,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structures and Drainage System – Construction of Dike and Revetment along Caulaman River, Bodega, Floridablanca, Pampanga
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Agency-level releases for FY2020, not tied to this contract

Pampanga 3rd DEO · SARO 1,970 (₱160,521,624,356.00) · NCA 998 (₱407,918,568,220.27)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

64 projects · ₱1.6B total · 0 flags

Other projects by this contractor

FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG ABACAN RIVER, BARANGAY SAPALIBUTAD, ANGELES CITY, PAMPANGA

Pampanga 3rd DEO, Region III

2025₱96.6M
Reported complete (100% progress, DPWH status On-Going)

Construction of Reinforced Concrete Slope Protection Structure along Abacan River, Barangay Pampang, Angeles City, Pampanga

ANGELES CITY (PAMPANGA), PAMPANGA, Region III

2024₱96.5M
Reported complete (DPWH)
No sat.

Construction of Slope Protection Structure along Abacan River, Barangays Malabanas to Anunas, Angeles City, Pampanga

ANGELES CITY (PAMPANGA), PAMPANGA, Region III

2023₱67.5M
Reported complete (DPWH)
No sat.

FLOOF MANAGEMENT PROGRAM; CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS; CONSTRUCTION OF FLOOD CONTROL STRUCTURE IN ANGELES CITY, PAMPANGA (PHASE I)

Pampanga 3rd DEO, Region III

2024₱62.7M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL PROGRAM; CONST/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES;ANGELES CITY TOLL EXIT CONNECTING NLEX AND SCTEX IN SUPPORT OF HANDICRAFT, FURNITURE,MANUFACTURING,HOTEL, IT-IBPM GARMENTS AND TEXTILES IND

Pampanga 3rd DEO, Region III

2020₱57.9M
Reported complete (DPWH)
No sat.

Construction of Reinforced Concrete Slope Protection with Steel Sheet Piles Foundation along Abacan River, Brgy. Tabun to Capaya, Angeles City, Pampanga - Sta. 1+949 - Sta. 2+699

ANGELES CITY (PAMPANGA), PAMPANGA, Region III

2022₱56.0M
Reported complete (DPWH)
View all 64 projects →

4. Implementation

Contract Amount

₱43,941,858.68

Progress

Reported complete (DPWH)

Start Date

December 9, 2020

Target End

June 6, 2021

5. Audit