Flood Control and Drainage25E00109

FLOOD MANAGEMENT PROGRAM- CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONST. OF SLOPE PROTECTION STRUCTURE (LAMORO BR. 1), STA. 000+000-STA. 000+082.13 (LEFT SIDE), EL NIDO, PALAWAN

FLOOD MANAGEMENT PROGRAM- CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONST. OF SLOPE PROTECTION STRUCTURE (LAMORO BR. 1), STA. 000+000-STA. 000+082.13 (LEFT SIDE), EL NIDO, PALAWAN is a DPWH-tracked public work in Region IV-B, Region IV-B. Reported contract value: ₱46,271,754.50. Status: Past target date (DPWH On-Going). Contractor on record: WAWAO BUILDERS. Figures trace to dpwh.

Region IV-B, Region IV-B
Region: Region IV-B

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

No GAA appropriation line matched for this project at current confidence thresholds.

2. Allotment

No SARO/NCA release rows linked to this project yet. See DBM release listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

164 projects · ₱9.2B total · 0 flags

4. Implementation

Contract Amount

₱46,271,754.50

Progress

Past target date (DPWH On-Going)

Start Date

March 27, 2025

Target End

July 31, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.