CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SUAGE RIVER (SECTION 11), JANIUAY, ILOILO
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SUAGE RIVER (SECTION 11), JANIUAY, ILOILO is a DPWH-tracked public work in Region VI, Region VI. Reported contract value: ₱80,117,363.67. Status: Past target date (DPWH On-Going). Contractor on record: J E TICO CONST CO INC FORMERLY: JET CO. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost
