CLUSTER I-1. CONST. OF RAINWATER COLLECTOR SYSTEM, COLUNDANUM ES, BRGY. CANIPAAN, RIZAL, PAL., 2. CONST. OF RWCS, TABURI NHS BRGY. TABURI, RIZAL, PAL. 3. CONST. OF RWCS, CULASIAN OLD ES, BRGY. CULASIAN, RIZAL, PAL. 4. CONST. OF RWCS, REDROSE CULASIAN ....
CLUSTER I-1. CONST. OF RAINWATER COLLECTOR SYSTEM, COLUNDANUM ES, BRGY. CANIPAAN, RIZAL, PAL., 2. CONST. OF RWCS, TABURI NHS BRGY. TABURI, RIZAL, PAL. 3. CONST. OF RWCS, CULASIAN OLD ES, BRGY. CULASIAN, RIZAL, PAL. 4. CONST. OF RWCS, REDROSE CULASIAN .... is a DPWH-tracked public work in Palawan 2nd DEO, Region IV-B. Reported contract value: ₱0.00. Status: Ongoing (DPWH-reported) (For Procurement (DPWH-reported)). Contractor on record: Contractor not linked in this database. Figures trace to dpwh.
Total Contract Cost
