CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG THE LEFT BANK OF DISAKAN RIVER (UPSTREAM), MANUKAN, ZAMBO. NORTE, (PHASE II).
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG THE LEFT BANK OF DISAKAN RIVER (UPSTREAM), MANUKAN, ZAMBO. NORTE, (PHASE II). is a DPWH-tracked public work in Zamboanga del Norte 2nd DEO, Region IX. Reported contract value: ₱9,422,837.17. Status: Reported complete (DPWH). Contractor on record: JIMWEN CONST. Figures trace to dpwh.
Total Contract Cost
