Flood Control and Drainage23FB0129

SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES CONSTRUCTION OF RIVER BANK PROTECTION WORKS AND DRAINAGE SYSTEM ALONG PUROK 3 SITIO LAOM, BRGY. PADANG (UPSTREAM), LEGAZPI CITY, ALBAY

SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES CONSTRUCTION OF RIVER BANK PROTECTION WORKS AND DRAINAGE SYSTEM ALONG PUROK 3 SITIO LAOM, BRGY. PADANG (UPSTREAM), LEGAZPI CITY, ALBAY is a DPWH-tracked public work in Albay 2nd DEO, Region V. Reported contract value: ₱48,962,862.08. Status: Past target date (DPWH On-Going). Contractor on record: INFRA BUILDERS AND SELLERS PHILIPPINES 9391. Figures trace to dpwh.

Albay 2nd DEO, Region V
Region: Region V

Money Trail

1. Appropriation

Probable match · score 85%

UACS
18001
Amount
₱10,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control and Drainage System in Regional Center Site, Rawis, Legazpi City, Albay
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Albay 2nd DEO · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

DPWH ID 9391

10 projects · ₱570.8M total · 0 flags

Other projects by this contractor

No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF RIVER BANK PROTECTION STRUCTURE AND DRAINAGE STRUCTURE, RIVER TRIBUTARIES, BARANGAY TAYSAN, PACKAGE 2, LEGAZPI CITY, ALBAY

Albay 2nd DEO, Region V

2025₱72.4M
Reported complete (100% progress, DPWH status On-Going)
No sat.

BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF RIVER BANK PROTECTION WORKS AND DRAINAGE SYSTEM ALONG BARANGAY PADANG (DOWNSTREAM), PACKAGE 2, LEGAZPI CITY, ALBAY

Albay 2nd DEO, Region V

2024₱69.3M
Past target date (DPWH On-Going)
No sat.

BIP - FLOOD MITIGATION STRUCTURES PROTECTIONG MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF RIVER BANK PROTECTION WORKS AND DRAINAGE SYSTEM ALONG BARANGAY PADANG (DOWNSTREAM), LEGAZPI CITY, ALBAY

Albay 2nd DEO, Region V

2024₱69.3M
Reported complete (DPWH)
No sat.

BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF RIVER BANK PROTECTION WORKS AND DRAINAGE SYSTEM ALONG BARANGAY TAYSAN, LEGAZPI CITY, ALBAY

Albay 2nd DEO, Region V

2024₱66.8M
Reported complete (100% progress, DPWH status On-Going)
No sat.

FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES / FACILITIES - CONSTRUCTION OF RIVER BANK PROTECTION WORKS AND DRAINAGE SYSTEM ALONG BARANGAY PADANG (DOWNSTREAM), LEGAZPI CITY, ALBAY

Albay 2nd DEO, Region V

2023₱65.2M
Reported complete (100% progress, DPWH status On-Going)
No sat.

BIP: CONSTRUCTION OF ROAD, BARANGAY PADANG, LEGAZPI CITY, ALBAY

Albay 2nd DEO, Region V

2024₱59.4M
Past target date (DPWH On-Going)
View all 10 projects →

4. Implementation

Contract Amount

₱48,962,862.08

Progress

Past target date (DPWH On-Going)

Start Date

May 3, 2023

Target End

October 29, 2023

5. Audit