CLUSTER III-1. CONST. OF RAINWATER COLLECTOR SYSTEM (RWCS) TABUD ELEM. SCHOOL 2. CONST. OF RAINWATER COLLECTOR SYSTEM (RWCS) TAGOLANGO ELEM. SCHOOL, BATARAZA, PALAWAN
CLUSTER III-1. CONST. OF RAINWATER COLLECTOR SYSTEM (RWCS) TABUD ELEM. SCHOOL 2. CONST. OF RAINWATER COLLECTOR SYSTEM (RWCS) TAGOLANGO ELEM. SCHOOL, BATARAZA, PALAWAN is a DPWH-tracked public work in Palawan 2nd DEO, Region IV-B. Reported contract value: ₱741,560.00. Status: Reported complete (DPWH). Contractor on record: CM77 CONST TRADING 52062. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost
